What does a typical bathroom renovation involve?

A bathroom is the most technical room in most homes: waterproofing, plumbing, electrics, heating and ventilation all packed into the smallest space in the property. This is what the work actually involves, stage by stage, including the parts nobody sees afterwards.

Completed Revivio bathroom renovation with a walk-in shower, recessed niche and large-format tiling
Sheet G–02 · Stage one

Strip-out: back to the structure

A bathroom renovation starts by removing everything that is currently there.

  • The old sanitaryware comes out — bath, shower, WC, basin and any vanity units.
  • Tiles are removed, not tiled over. Tiling onto old tiles buries whatever is wrong behind them and adds thickness where you usually cannot afford it.
  • Wall boards that are unsuitable or damaged are removed and replaced. In a wet area, a board that has taken water in the past is not a base you can build on.

Once it is stripped, we assess the exposed construction: what the walls are actually made of, how flat and sound they are, the state of the floor, and whether anything behind the old bathroom has been getting wet.

Strip-out is the only stage where the whole room is visible. Anything not dealt with here gets sealed in for the life of the bathroom.

Sheet G–03 · Stage two

Plumbing, preparation and waterproofing

Three stages that are completely invisible in the finished room, and which between them decide whether it lasts.

Plumbing assessment
With the walls open we can see the existing pipework and waste runs, and assess whether they are suitable for the new layout and worth keeping. Where they are not, we recommend upgrades — and explain why before anything is agreed.
Covers: supplies · waste runs · layout changes
Wall preparation
Appropriate boards and preparation for what is going on top, so that surfaces are flat, sound and suitable. Tiles and microcement both telegraph whatever is underneath them; neither will correct a wall that is out.
Covers: suitable boarding · flat, sound substrates
Waterproofing and tanking
Wet areas are waterproofed before any finish goes on. Tiles and grout are not a waterproof layer — the tanking behind them is. This is the single least visible part of a bathroom and the one that causes the most expensive failures when it is skipped.
Covers: tanking of wet areas · junctions and detailing
Concealed plumbing
Where the design calls for it, cisterns, valves and pipework are concealed within the wall build-up so the finished room shows fittings rather than services. This has to be planned at first fix; it cannot be added later.
Covers: concealed cisterns · recessed valves

More on why we do it this way: why we recommend doing things properly.

Sheet G–04 · Stage three

Bath, shower and the decisions worth making early

Bath or shower — or both

The first decision is what the room is for. A single bathroom in a family home is a different brief from an en-suite or a second shower room, and the answer changes the layout, the plumbing and how much usable space you end up with.

Shower niches

A recessed niche puts everything you use in the shower inside the wall instead of on it. Niches come in different sizes and can be positioned to suit how the shower is used and where the wall build-up allows — a tall narrow recess, a wide shelf, or more than one. Because a niche is formed in the wall and waterproofed as part of it, the position has to be agreed before boarding, not after.

Tiled shower seating

Where there is room, a built-in tiled seat or bench can be formed as part of the shower and finished in the same material. It is optional, but it is another thing that has to be built in early — it is not something that can be added to a finished shower.

Where these choices land

Niches, seating, concealed plumbing and underfloor heating all get built during the invisible stages. Decide them at the planning stage and they cost very little extra; decide them after boarding and waterproofing and you are undoing finished work.

Sheet G–05 · Stage four

Fittings, heating and finishing

With the preparation done, the visible bathroom goes in: new sanitaryware, and taps and brassware chosen to match it. LED mirrors, where they are wanted, need a supply run at first fix — another reason the electrical layout is agreed early.

On the comfort side, underfloor heating suits most bathrooms and removes the need for a radiator taking up wall space, and a heated towel rail handles towels. Ventilation is not optional: a bathroom that cannot clear moisture will eventually show it, whatever it was finished in.

For finishes, tiling remains the standard choice. Microcement is an alternative where it is appropriate — it gives an almost continuous surface with very few joints, and it depends completely on the preparation and waterproofing beneath it. We used it in the Marylebone flat refurbishment. Either way, the room finishes with sealing, silicone, trims and the detailing that decides whether it looks finished or nearly finished.

What a complete bathroom renovation covers is set out on bathroom renovations, and the manufacturers and materials we work with are listed in our FAQs.